| Roadwork & Maintenance Activities by Month. |
| Roadwork - Interstate 10 |
Interstate 10 in both directions: from Exit 159: I-12 to Exit 160: LA 3064; Essen Lane new road construction layout, road construction Comment: I-10 Eastbound between the I-12/I-10 Junction and Essen Lane is scheduled to have a traffic shift for approximately one year. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: at Exit 162B Picardy; Mall of Louisiana road construction, entrance ramp closed Comment: I-10 Westbound at Picardy entrance ramp will be closed until further notice. Alternate Traffic Route: Continue on Picardy and enter I-10 on the Bluebonnet Entrance Ramp. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 162B Picardy; Mall of Louisiana to Exit 163: LA 3246; Siegen Lane new road construction layout, road construction Comment: I-10 Eastbound between Picardy Ave. and Siegen Lane is scheduled to have a traffic shift for approximately one year. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 226 LA 3152; Clearview Parkway to Exit 228: Lake Pontchartrain Causeway; Causeway Boulevard; LA 3046 new road construction layout, construction work Comment: I-10 Eastbound between Clearview Parkway and Causeway Blvd. is scheduled to have a travel lane pattern change. There will now be 4 through lanes beginning at Clearview and only one lane will exit to Causeway Blvd. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: between Exit 254: US 11; North Shore Drive and Exit 263: LA 433; Old Spanish Trail bridge construction, left lane closed — last updated February 6 |
| |
| Roadwork - Interstate 12 |
Interstate 12 eastbound: from after Exit 7: LA 3245; O'Neal Lane to before Exit 10: LA 3002; South Range Avenue new road construction layout — until June 30 last updated January 25 |
| |
| Roadwork - US 90-Z |
US 90Z in both directions: between US 90 and LA 18-S; Lousiana Street construction work, road closed Comment: Nine Mile Point Road is closed in both directions at US 90. last updated January 25 |
| |
| Roadwork - LA 20 |
LA 20 in both directions: from Tauzin Lane to Grand Drive bridge maintenance operations, bridge closed — Comment: Grand Bayou Bridge closed on LA 20 between Grand Dr. and Tauzin Ln. because of maintenance. Detour route on side of closure. last updated February 1 |
| |
| Roadwork - LA 64 |
LA 64 in both directions: from LA 3034, LA 37 to LA 1019 construction work, bridge construction — until November 30 Comment: LA 64 between LA 37 and LA 1019 will be under construction. There are no closures scheduled now, but motorists are asked to use caution in this area. last updated January 25 |
| |
| Roadwork - LA 105 |
LA 105 in both directions: from LA 1183 to LA 1 construction work, intermittent lane closure Comment: LA 105 between LA 1 and LA 1183 is scheduled to have intermittent closures lasting for several months. last updated January 24 |
| |
| Roadwork - LA 413 |
LA 413 in both directions: from LA 414 to LA 414 construction work, intermittent lane closure from 06:00am CST to 06:00pm CST on weekends and from 08:30am CST to 06:00pm CST on weekdays — until November 12 Comment: LA 413 between LA 414 and LA 141 is scheduled to have intermittent lane closures. Permit Load Restriction: oversize loads over 10' must call either the contractor or the Project Engineer for permission to travel through the construction area. last updated January 13 |
| |
| Roadwork - LA 428 |
LA 428 in both directions: at Maine Street road closed, construction work Comment: Seine Court at LA 428 is scheduled to be closed. Alternate Traffic Route: Life Center Dr. last updated January 25 |