| Closure - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway: at I-10 entrance ramp closed because of construction work — until March 1, 2012 Comment: A temporary entrance to I-10 West will be provided at the intersection of Severn and the North I-10 Service Rd. The entrance in intended for Veterans traffic headed to I-10 West. All traffic using the entrance must enter I-10 West from Southbound Severn only. A few closures will be necessary: 1) No left turn from Westbound Veterans onto Southbound Causeway. 2) No left turn from Southbound Severn onto Eastbound Veterans. last updated September 2 |
| |
| Closure - LA 1 |
LA 1 southbound: at Old State Highway 1 open -- electronic toll lanes — Comment: The Leeville Bridge Toll is operational. There is NO toll booth. Drivers must obtain a GeauxPass or one-time trip pass by visiting www.geauxpass.com click here, visiting the GeauxPass Customer Service Center at 1821 South Alex Plaisance Blvd. in Golden Meadow, or by contacting the center toll free at 1-866-662-8987. You can also contact the Customer Service Center by e-mail at customerservice@geauxpass.com for more information. last updated April 2 |
| |
| Closure - LA 308 |
LA 308 in both directions: from 52nd Street to 53rd Street bridge closed because of bridge maintenance work from 07:00am CDT to 07:00pm CDT daily — until Tuesday, at about 7:00 AM CDT Comment: The Cote Blanche Pontoon bridge on LA 308 E. Main St. between LA 308 and LA 1 W. Main St. near E. 52 nd St. and E. 53 rd St. is now only open to boat traffic from 7 am to 7 pm daily and vehicle traffic 24/7. The bridge will close to traffic 9/3 at 7 pm and will resume the afforementioned schedule on 9/7 at 7 am. last updated September 3 |
| |
| Closure - LA 3017 |
LA 3017 in both directions: at Lapalco Boulevard road closed due to emergency maintenance activities — Comment: The Lapalco Blvd Bridge is closed until further notice, due to a barge strike. last updated April 2 |
| |
| Roadwork - US 90 |
US 90 in both directions: from South Galvez Street to Orleans Avenue road construction, road closed intermittently, truck restrictions in force Height limit 16 ' 6 ", Width limit 9 ' 0 " Comment: KMTC will be switching the traffic configuration at the West bank Traffic Circle of the Huey P. Long bridge. Bridge City Avenue traffic heading east on the west side of US 90 coming from the shipyards will also be detoured to the south some to facilitate the box culvert work going through the west side of the traffic circle. Height Restriction: because of the tunnel section the height restriction is 16'-6". last updated August 6 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway northbound: at I-10 construction work, entrance ramp closed — until September 21 Comment: I-10 Westbound on-ramp from Northbound Causeway will be closed for 90 days. Alternate Traffic Route: South I-10 Service Rd. to Bonnabel and U-turn at Bonnabel to enter I-10 west. last updated August 6 |
| |
| Roadwork - LA 46 |
LA 46 in both directions: from Sylvia Drive to LA 300 road construction — until March 1, 2011 Comment: Hwy 46 Northbound and Southbound in St. Bernard Parish adjacent to the Fire Station 10 near Veret will have lane shifts beginning July 21, 2010 and remain in effect until March 2011. Southbound access to Fire Station Road will be open to traffic during all phases. Phase 1: Northbound and Southbound traffic will be limited to using the outside lanes while crews construct temporary crossovers just North and South of the future floodgates. Phase 1 lane shifts will begin July 21 until August 2010. Phase 2: Southbound traffic North of the floodgates will cross over to the single inside lane of the Northbound side of Hwy 46. Northbound traffic will be limited to using the single outside lane of the Northbound side. Southbound traffic will cross back over to the Southbound lanes just South of the future floodgates. Phase 2 lane shifts will begin in August 2010 until January 2011. Phase 3: Northbound traffic South of the floodgates to cross over to use the single inside Southbound lane. Traffic will be limited to using the single outside Southbound lane. Northbound traffic will cross back over to the Northbound lanes just North of the floodgates. Phase 3 lane shifts will begin January 2011 until March 2011. last updated July 22 |
| |
| Roadwork - LA 541 |
LA 541 in both directions: from LA 18 to Bridge City Avenue construction work, road closed intermittently, lane closed from 06:30am UTC -04:00 to 05:00pm UTC -04:00 daily — until September 17 Comment: River Road, LA 541 between Bridge City Ave to LA 18 will have alternating lane closures with flagmen present. Alternate Traffic Route: LA 18 last updated August 6 |
| |
| Roadwork - LA 624 |
LA 624: at LA 46 bridge maintenance operations, lane closed from 07:00am CDT to 05:00pm CDT on weekdays and Saturdays — until April 19, 2011 Comment: LA 624 approximately 600' west of Hopedale Marina Bridge to 500' eat off the bridge in St. Bernard Parish will have intermittent lane closures. last updated August 6 |
| |
| Roadwork - LA 3152 |
LA 3152: at LA 48 work on underground services, right lane closed — until today at about 11:45 PM CDT last updated August 27 |