| All Current Incidents. |
| Closure - Interstate 310 |
Interstate 310 eastbound: from Exit 7: LA 18; River Road to Exit 6: LA 48 road closed, bridge construction — until tomorrow at about 5:00 AM CST Comment: I-310 Northbound at the Hale Boggs Bridge is scheduled to be closed. Altnerate Traffic Route: Mississippi River Bridge in Gramercy or the Huey P. Long Bridge in Bridge City. last updated February 7 |
| |
| Closure - US 90 |
US 90 eastbound: between LA 541; River Road and LA 3152, LA 48; Clearview Parkway road closed, bridge construction from 01:30am CST to 05:00am CST on weekdays — until Friday, at about 5:00 AM CST Comment: US 90 eastbound at the Huey P. Long Bridge is scheduled to be closed. last updated February 8 |
| |
| Closure - US 90 |
US 90 westbound: between LA 541; River Road and LA 3152, LA 48; Clearview Parkway road closed, bridge construction from 10:00pm CST to 01:30am CST on weekdays — until Friday, at about 1:30 AM CST Comment: US 90 Westbound on the Huey P. Long Bridge is scheduled to be closed. last updated February 8 |
| |
| Closure - LA 1 |
LA 1 southbound: at Old State Highway 1 open -- electronic toll lanes — Comment: The Leeville Bridge Toll is operational. There is NO toll booth. Drivers must obtain a GeauxPass or one-time trip pass by visiting www.geauxpass.com click here, visiting the GeauxPass Customer Service Center at 1821 South Alex Plaisance Blvd. in Golden Meadow, or by contacting the center toll free at 1-866-662-8987. You can also contact the Customer Service Center by e-mail at customerservice@geauxpass.com for more information. last updated January 25 |
| |
| Closure - LA 18 |
LA 18 in both directions: at Wiegand Drive road closed, construction work — until Wednesday, at about 9:00 PM CST Comment: Westbank Weigand Drive at Bridge City Ave. is scheduled to be completely closed. Alternate Traffic Route: Hooter Rd. last updated January 12 |
| |
| Closure - LA 327 |
LA 327 in both directions: between Ben Hur Road and Trinity Lane road closed, construction work — for the next five months Comment: LA 327 at Lake Beau Pre Blvd. is scheduled to be closed. Alternate Traffic Routes: Hwy 327 South to Skip Bertman Rd. to LA 30 to Gardere Ln. and Hwy 327 North to Gardere Ln. to LA 30 to Skip Bertman Rd. last updated January 25 |
| |
| Delays - Interstate 12 |
Interstate 12 westbound: from Exit 10: LA 3002; South Range Avenue to Exit 12: LA 1026; Juban Road traffic congestion — last updated today at 12:12 PM CST |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from after Exit 115: LA 347; Grand Point Highway to before Exit 139: LA 77; Bayou Road; Sidney Road bridge maintenance operations, right lane closed from 07:00pm CST to 06:00am CST on weekdays and Saturdays — until February 24 Comment: I-10 eastbound on the Atchafalaya Basin Bridge is scheduled to have the right lane closed in one to two mile continuous sections. last updated February 7 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: from after Exit 115: LA 347; Grand Point Highway to before Exit 135: LA 3000 construction work, right shoulder closed — until Friday, at about 8:00 PM CST Comment: I-10 westbound on the Atchafalaya Basin Bridge between Ramah and Henderson is scheduled to have the right shoulder closed. last updated February 7 |
| |
| Roadwork - Interstate 10 |
Interstate 10 in both directions: from Exit 159: I-12 to Exit 160: LA 3064; Essen Lane new road construction layout, road construction Comment: I-10 Eastbound between the I-12/I-10 Junction and Essen Lane is scheduled to have a traffic shift for approximately one year. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: at Exit 162B Picardy; Mall of Louisiana road construction, entrance ramp closed Comment: I-10 Westbound at Picardy entrance ramp will be closed until further notice. Alternate Traffic Route: Continue on Picardy and enter I-10 on the Bluebonnet Entrance Ramp. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 162B Picardy; Mall of Louisiana to Exit 163: LA 3246; Siegen Lane new road construction layout, road construction Comment: I-10 Eastbound between Picardy Ave. and Siegen Lane is scheduled to have a traffic shift for approximately one year. last updated January 25 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: from after Exit 221 Loyola Drive to before Exit 223: LA 49; Williams Boulevard construction work, left lane closed from 09:00am CST to 04:00pm CST on weekdays — until Friday, at about 4:00 PM CST Comment: Loyola Dr. Southbound between Clemson Dr. and I-10 is scheduled to have the left lane closed. last updated February 6 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 225 LA 3019; Veterans Memorial Boulevard to Exit 226 LA 3152; Clearview Parkway road construction, roadway reduced to one lane, alternating lane closures from 09:30pm CST to 05:30am CST on Mondays, Tuesdays, Wednesdays and Thursdays — until Friday, at about 5:30 AM CST Comment: I-10 Eastbound between Veterans Blvd. and Clearview Parkway is scheduled to have 2 alternating lanes closed. Only 1 lane of traffic will be open during these closures. last updated February 9 |
| |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 226 LA 3152; Clearview Parkway to Exit 228: Lake Pontchartrain Causeway; Causeway Boulevard; LA 3046 new road construction layout, construction work Comment: I-10 Eastbound between Clearview Parkway and Causeway Blvd. is scheduled to have a travel lane pattern change. There will now be 4 through lanes beginning at Clearview and only one lane will exit to Causeway Blvd. last updated January 25 |
| |
| Roadwork - Interstate 12 |
Interstate 12 eastbound: from after Exit 7: LA 3245; O'Neal Lane to before Exit 10: LA 3002; South Range Avenue new road construction layout — until June 30 last updated January 25 |
| |
| Roadwork - Interstate 12 |
Interstate 12 in both directions: from Exit 12: LA 1026; Juban Road to Exit 15: LA 447; Walker South Road road construction, right lane closed from 07:00pm CST to 05:00am CST on Monday, Tuesday, Wednesday and Thursday — until Friday, at about 5:00 AM CST Comment: I-12 Eastbound and Westbound between LA 1026 and LA 447 is scheduled to have the right lane closed. Alternate Traffic Route: US 190. last updated February 1 |
| |
| Roadwork - US 61B |
US 61B northbound: from after LA 3164 to before LA 30; North River Road utility work, road closed — until February 24 Comment: Northbound US 61 will have both lanes closed between the intersection with State Capitol Drive and the intersection with North 3rd Street. Northbound and southbound traffic will be maintained using the southbound lanes through this section. last updated February 9 |
| |
| Roadwork - US 90-Z |
US 90Z in both directions: between US 90 and LA 18-S; Lousiana Street construction work, road closed Comment: Nine Mile Point Road is closed in both directions at US 90. last updated January 25 |
| |
| Roadwork - US 90 |
US 90 in both directions: from LA 541; River Road to before LA 3152, LA 48; Clearview Parkway bridge construction, left lane closed from 07:00am CST to 05:30pm CST on Saturdays and from 09:00am CST to 03:00pm CST on weekdays — until Friday, at about 3:00 PM CST Comment: US 90 Eastbound and Westbound at the Huey P. Long Bridge is scheduled to have the left lane closed. last updated February 8 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway: at I-10 construction work, entrance ramp closed — until March 1 Comment: A temporary entrance to I-10 West will be provided at the intersection of Severn and the North I-10 Service Rd. The entrance in intended for Veterans traffic headed to I-10 West. All traffic using the entrance must enter I-10 West from Southbound Severn only. A few closures will be necessary: 1) No left turn from Westbound Veterans onto Southbound Causeway. 2) No left turn from Southbound Severn onto Eastbound Veterans. last updated January 25 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway southbound: after I-10 road construction, intermittent lane closure, roadway reduced to two lanes — until March 10 Comment: Lake Pontchartrain Causeway Bridge on the southshore Southbound is scheduled to have intermittent lane closures resulting in only 2 exit lanes on the Causeway Bridge. Anticipated Delays: 20 minute delays. last updated January 25 |
| |
| Roadwork - LA 20 |
LA 20 in both directions: from Tauzin Lane to Grand Drive bridge maintenance operations, bridge closed — Comment: Grand Bayou Bridge closed on LA 20 between Grand Dr. and Tauzin Ln. because of maintenance. Detour route on side of closure. last updated February 1 |
| |
| Roadwork - LA 21 |
LA 21 in both directions: from after I-12 to before North Marigold Drive construction work, alternating lane closures, intermittent lane closure from 08:00am CST to 05:00pm CST daily — until March 11 Comment: LA 21 Northbound and Southbound between Ochsner Blvd and Bootlegger Rd. in St. Tammany Parish is scheduled to have alternating and intermittent left lane closures. last updated February 8 |
| |
| Roadwork - LA 24 |
LA 24: at LA 311 bridge maintenance operations, local road closures in area, bridge closed — Comment: The Hollywood Canal Bridge is closed on Burma Rd. between Martinez Rd. and Lefort Bypass Rd. for repairs. Local traffic allowed up to the closure. last updated February 3 |
| |
| Roadwork - LA 24 |
LA 24 in both directions: from Presque Isle Drive to LA 55 road reconstruction, road marking operations, alternating lane closures -- look out for flaggers from 07:30am CST to 04:30pm CST on weekdays — until April 6 Comment: Alternating lane closures on LA 24/659 E. Park Ave. between Presque Isle Dr. and LA 24 Bourg Larose Hwy. from Wednesday, January 4th through April; 7:00 AM to 5:30 PM Monday through Friday because of road reconstruction. Expect flaggers and temporary stops. last updated January 11 |
| |
| Roadwork - LA 42 |
LA 42 westbound: between Meadowbend Drive and LA 327-S construction work, right lane closed from 09:00am CST to 03:00pm CST on weekdays — until Friday, at about 3:00 PM CST Comment: La 42 Westbound between Highland Rd. to Staring Lane is scheduled to be closed Monday-Friday 9AM-3PM and continuous on weekends between Friday night at 6PM to Monday morning at 6AM. last updated February 3 |
| |
| Roadwork - LA 50 |
LA 50 in both directions: from LA 48 to Almedia Plantation Drive construction work, alternating lane closures from 06:30am CST to 05:45pm CST on weekdays and Saturdays — until February 25 Comment: LA 50 from LA 48 to the ICG Railroad is scheduled to have alternating lane closures with flagmen present. last updated today at 11:02 AM CST |
| |
| Roadwork - LA 64 |
LA 64 in both directions: from LA 3034, LA 37 to LA 1019 construction work, bridge construction — until November 30 Comment: LA 64 between LA 37 and LA 1019 will be under construction. There are no closures scheduled now, but motorists are asked to use caution in this area. last updated January 25 |
| |
| Roadwork - LA 3002 |
LA 3002 in both directions: from Highpoint Boulevard to Highpoint Boulevard construction work, intermittent lane closure from 07:00am CST to 05:00pm CST on weekdays — until March 31 Comment: Tate Road between S. Range Ave. and Pete's Highway is scheduled to have intermittent delays and possible single lane closures. Alternate Traffic Route: Rushing Road . last updated January 25 |
| |
| Roadwork - LA 3087 |
LA 3087 in both directions: at LA 24 bridge construction, bridge closed, temporary three-way stop condition — until May 24 Comment: The Prospect Lift Bridge on LA 3087 Prospect Blvd. between LA 24/659 E. Park Ave. and LA 24/56 E. Main St. will be closed on May 24, 2010 for the next two years because of bridge construction. Detour bridges: Westbound: Daigville Lift 1.5 mi or Howard Ave. Lift 1 mi. Eastbound: Presque Isle Lift 2.5 mi or Bayouside Dr. Draw 4 mi. Three way stop at intersection of LA 3087 Prospect Blvd. and LA 24/56 East Main St. Expect temporary lane closures with flaggers and alternating traffic flow. All turn lanes on either LA 24/56 or LA 24/659 used to cross the bridge are closed. Expect congestion. Drive with caution. last updated February 3 |
| |
| Roadwork - LA 3245 |
LA 3245 in both directions: at I-12 construction work, lane closed — until March 3 Comment: O'Neal Lane at the I-12 underpass is scheduled to have a lane closed continuously. All entrance and exit ramps will remain open and left turning lanes will also be open. last updated January 5 |