| Roadwork & Maintenance Activities by Month. |
| Roadwork - Interstate 10 |
Interstate 10 in both directions: from Exit 226 LA 3152; Clearview Parkway to Exit 228: Lake Pontchartrain Causeway; Causeway Boulevard lane closed, road maintenance operations — starting 8:00 PM, 09/07/10 until September 10 Comment: I-10 Eastbound and Westbound between Causeway and Clearview will have alternating lane closures. There will also be alternating ramp closures in this area: I-10 Eastbound to Clearview southbound; Clearview southbound to I-10 eastbound; I-10 eastbound collector ramp; Clearview southbound to I-10 westbound; I-10 westbound to Clearview southbound; I-10 westbound collector ramp. last updated September 3 |
| |
| Roadwork - Interstate 610 |
Interstate 610 westbound: from after Pontchartrain Boulevard to before US 90; New Orleans Street paving operations, roadway reduced to one lane from 08:00pm CDT to 05:30am CDT daily — starting 8:00 PM, 09/07/10 until September 14 last updated September 2 |
| |
| Roadwork - US 90 |
US 90 in both directions: from LA 3152 to Saint George Avenue work on underground services, lane closed — starting 7:00 AM, 09/06/10 until September 10 Comment: US 90 in both directions from St. George to Clearview will have lane closures. last updated August 31 |
| |
| Roadwork - US 90 |
US 90 in both directions: from South Galvez Street to Orleans Avenue road construction, road closed intermittently, truck restrictions in force Height limit 16 ' 6 ", Width limit 9 ' 0 " Comment: KMTC will be switching the traffic configuration at the West bank Traffic Circle of the Huey P. Long bridge. Bridge City Avenue traffic heading east on the west side of US 90 coming from the shipyards will also be detoured to the south some to facilitate the box culvert work going through the west side of the traffic circle. Height Restriction: because of the tunnel section the height restriction is 16'-6". last updated August 6 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway northbound: at I-10 construction work, entrance ramp closed — until September 21 Comment: I-10 Westbound on-ramp from Northbound Causeway will be closed for 90 days. Alternate Traffic Route: South I-10 Service Rd. to Bonnabel and U-turn at Bonnabel to enter I-10 west. last updated August 6 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway: at I-10 entrance ramp closed because of construction work — until March 1, 2012 Comment: A temporary entrance to I-10 West will be provided at the intersection of Severn and the North I-10 Service Rd. The entrance in intended for Veterans traffic headed to I-10 West. All traffic using the entrance must enter I-10 West from Southbound Severn only. A few closures will be necessary: 1) No left turn from Westbound Veterans onto Southbound Causeway. 2) No left turn from Southbound Severn onto Eastbound Veterans. last updated September 2 |
| |
| Roadwork - LA 23 |
LA 23 southbound: from West X Street to P Street road closed, road maintenance operations — starting 6:00 PM, 09/07/10 until September 10 Comment: Belle Chasse Tunnel, LA 23, will be closed. Alternate Traffic Route: Two-way traffic on the Belle Chasse bridge or Behrman Hwy to General De Gaulle Drive to Woodland Hwy . last updated September 3 |
| |
| Roadwork - LA 541 |
LA 541 in both directions: from LA 18 to Bridge City Avenue construction work, road closed intermittently, lane closed from 06:30am UTC -04:00 to 05:00pm UTC -04:00 daily — until September 17 Comment: River Road, LA 541 between Bridge City Ave to LA 18 will have alternating lane closures with flagmen present. Alternate Traffic Route: LA 18 last updated August 6 |
| |
| Roadwork - LA 3017 |
LA 3017 in both directions: at Lapalco Boulevard road closed due to emergency maintenance activities — Comment: The Lapalco Blvd Bridge is closed until further notice, due to a barge strike. last updated April 2 |
| |
| Roadwork - LA 3152 |
LA 3152: at LA 48 work on underground services, right lane closed — until today at about 11:45 PM CDT last updated August 27 |
| |
| Roadwork - LA 3152 |
LA 3152 in both directions: at LA 48 road construction, right lane closed — starting 12:00 AM, 09/06/10 until September 10 last updated August 31 |
| |
| Roadwork - LA 3152 |
LA 3152: from Citrus Boulevard to US 61 construction work, left lane closed from 09:00am CDT to 03:00pm CDT on Tuesday, Wednesday, Thursday and Friday — starting 9:00 AM, 09/07/10 until September 10 Comment: Clearview Parkway Southbound from Airline Drive to Citrus Blvd. will have the left lane closed. last updated August 31 |