| Roadwork & Maintenance Activities by Month. |
| Roadwork - Interstate 10 |
Interstate 10 eastbound: from Exit 153: LA 1 to LA 30; Nicholson Drive bridge maintenance operations, right lane closed from 10:00pm CDT to 08:00am CDT on Fridays and Saturdays and from 08:00pm CDT to 06:00am CDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays — until September 12 Comment: I-10 eastbound at the Mississippi River Bridge will have the right lane closed. Alternate Traffic Route: I-10 LA 1 North to US 190 East to I-110 South to I-10. Permit Load Restrictions: No load over 10 ft. wide. last updated September 2 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: from Exit 153: LA 1 to before Exit 156B Dalrymple Drive bridge maintenance operations, left lane closed from 10:00pm CDT to 08:00am CDT on Fridays and Saturdays and from 08:00pm CDT to 05:00am CDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays — until September 12 last updated September 2 |
| |
| Roadwork - Interstate 10 |
Interstate 10 westbound: from Exit 159: I-12 to Exit 163: LA 3246; Siegen Lane bridge maintenance operations, roadway reduced to one lane Width limit 11 ' 0 " — Comment: I-10 Westbound from Siegen Lane to the I-10/I-12 Split will be reduced to one lane of thru traffic. These closures will allow vehicles 11 feet wide or smaller to pass through the construction zones. The road is open for regular traffic but oversize vehicles must detour using US 61 Sorrento exit to I-12 Westbound to I-10. last updated today at 11:56 AM CDT |
| |
| Roadwork - Interstate 10 |
Interstate 10 in both directions: from after Exit 159: I-12 to before Exit 162: LA 1248; Bluebonnet Boulevard long term road construction, left shoulder closed last updated August 6 |
| |
| Roadwork - Interstate 10 |
Interstate 10 in both directions: from Exit 226 LA 3152; Clearview Parkway to Exit 228: Lake Pontchartrain Causeway; Causeway Boulevard lane closed, road maintenance operations — starting 8:00 PM, 09/07/10 until September 10 Comment: I-10 Eastbound and Westbound between Causeway and Clearview will have alternating lane closures. There will also be alternating ramp closures in this area: I-10 Eastbound to Clearview southbound; Clearview southbound to I-10 eastbound; I-10 eastbound collector ramp; Clearview southbound to I-10 westbound; I-10 westbound to Clearview southbound; I-10 westbound collector ramp. last updated September 3 |
| |
| Roadwork - Interstate 12 |
Interstate 12 eastbound: from Exit 7: LA 3245; O'Neal Lane to Exit 10: LA 3002; South Range Avenue road construction, right shoulder closed last updated August 6 |
| |
| Roadwork - Interstate 12 |
Interstate 12: between Exit 65: LA 59 and Exit 74: LA 434 lane closed due to bridge construction work from 09:00pm CDT to 09:00am CDT on weekends and from 09:00pm CDT to 08:00am CDT on Fridays and Saturdays and from 08:00pm CDT to 06:00am CDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays — starting 8:00 PM, 09/07/10 until September 20 last updated September 2 |
| |
| Roadwork - Interstate 55 |
Interstate 55 in both directions: from after Tapigahoa Rest Area to Mississippi State Line paving operations Width limit 12 ' 0 " — until January 17, 2011 Comment: I-55 Northbound and Southbound beginning .5 miles south of Kentwood to the Mississippi State Line will have lane closures, with one lane to remain open at all times. Permit Load Restrictions: no oversize loads greater than 12ft. Alternate Traffic Route: Northbound - exit at LA 440 , travel approximately 1 mile east to US 51, then north on US 51 approximately 10 miles to Osyka Mississippi, turn left on MS 584, travel west for 1.8 miles to I-55. Southbound - exit on MS 584 , east to US 51, south to LA 440, then west to I-55. last updated September 3 |
| |
| Roadwork - Interstate 110 |
Interstate 110 westbound: between Exit 0: I-10 and LA 73; Government Street; Centroplex bridge construction, exit ramp closed — until September 12 Comment: I-110 Southbound ramp to I-10 Westbound will be closed nightly. last updated September 2 |
| |
| Roadwork - Interstate 610 |
Interstate 610 westbound: from after Pontchartrain Boulevard to before US 90; New Orleans Street paving operations, roadway reduced to one lane from 08:00pm CDT to 05:30am CDT daily — starting 8:00 PM, 09/07/10 until September 14 last updated September 2 |
| |
| Roadwork - US 61-X |
US 61X northbound: between LA 30; North River Road and I-110 construction work, roadway reduced to one lane — starting 6:00 PM, 09/07/10 until Wednesday, at about 6:00 AM CDT last updated September 3 |
| |
| Roadwork - US 90 |
US 90 in both directions: from LA 3152 to Saint George Avenue work on underground services, lane closed — starting 7:00 AM, 09/06/10 until September 10 Comment: US 90 in both directions from St. George to Clearview will have lane closures. last updated August 31 |
| |
| Roadwork - US 90 |
US 90 in both directions: from South Galvez Street to Orleans Avenue road construction, road closed intermittently, truck restrictions in force Height limit 16 ' 6 ", Width limit 9 ' 0 " Comment: KMTC will be switching the traffic configuration at the West bank Traffic Circle of the Huey P. Long bridge. Bridge City Avenue traffic heading east on the west side of US 90 coming from the shipyards will also be detoured to the south some to facilitate the box culvert work going through the west side of the traffic circle. Height Restriction: because of the tunnel section the height restriction is 16'-6". last updated August 6 |
| |
| Roadwork - US 190 |
US 190 westbound: between LA 975 and Two River Road construction work, roadway reduced to one lane from 07:00am CDT to 04:00pm CDT on Wednesday and Thursday — starting 7:00 AM, 09/08/10 until Thursday, at about 4:00 PM CDT Comment: US 190 westbound in Pointe Coupee Parish will have the right closed at mile marker 141.5 east of the town of Krotz Springs. last updated August 31 |
| |
| Roadwork - US 190 |
US 190 westbound: from after LA 426 to before Riverview Drive left lane closed due to road construction work — starting 9:00 AM, 09/08/10 until Thursday, at about 4:00 PM CDT last updated September 2 |
| |
| Roadwork - US 190 |
US 190 westbound: from after LA 426 to before Riverview Drive left lane closed due to road construction work — starting 9:00 AM, 09/08/10 until Thursday, at about 4:00 PM CDT Comment: US 190 Westbound at the Amite River Bridge will have the left lane closed on Wednesday, Sept. 8th, through Thursday, Sept. 9th, from 9:00 AM to 4:00 PM, while crews deliver materials to the jobsite. This closure will allow vehicles up to 11 feet wide to pass through the construction zone. Oversized vehicles and loads are under permit restrictions. Motorists may use I-12 as an alternate route. last updated September 2 |
| |
| Roadwork - US 190 |
US 190 westbound: from Holiday Boulevard to I-12 left lane closed, center lane closed, road construction — starting 7:30 PM, 09/09/10 until September 10 Comment: US 190 Westbound from North of I-12 to Holiday Blvd. the left and center lanes will be closed. last updated September 3 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway northbound: at I-10 construction work, entrance ramp closed — until September 21 Comment: I-10 Westbound on-ramp from Northbound Causeway will be closed for 90 days. Alternate Traffic Route: South I-10 Service Rd. to Bonnabel and U-turn at Bonnabel to enter I-10 west. last updated August 6 |
| |
| Roadwork - Lake Pontchartrain Causeway |
Lake Pontchartrain Causeway: at I-10 entrance ramp closed because of construction work — until March 1, 2012 Comment: A temporary entrance to I-10 West will be provided at the intersection of Severn and the North I-10 Service Rd. The entrance in intended for Veterans traffic headed to I-10 West. All traffic using the entrance must enter I-10 West from Southbound Severn only. A few closures will be necessary: 1) No left turn from Westbound Veterans onto Southbound Causeway. 2) No left turn from Southbound Severn onto Eastbound Veterans. last updated September 2 |
| |
| Roadwork - LA 46 |
LA 46 in both directions: from Sylvia Drive to LA 300 road construction — until March 1, 2011 Comment: Hwy 46 Northbound and Southbound in St. Bernard Parish adjacent to the Fire Station 10 near Veret will have lane shifts beginning July 21, 2010 and remain in effect until March 2011. Southbound access to Fire Station Road will be open to traffic during all phases. Phase 1: Northbound and Southbound traffic will be limited to using the outside lanes while crews construct temporary crossovers just North and South of the future floodgates. Phase 1 lane shifts will begin July 21 until August 2010. Phase 2: Southbound traffic North of the floodgates will cross over to the single inside lane of the Northbound side of Hwy 46. Northbound traffic will be limited to using the single outside lane of the Northbound side. Southbound traffic will cross back over to the Southbound lanes just South of the future floodgates. Phase 2 lane shifts will begin in August 2010 until January 2011. Phase 3: Northbound traffic South of the floodgates to cross over to use the single inside Southbound lane. Traffic will be limited to using the single outside Southbound lane. Northbound traffic will cross back over to the Northbound lanes just North of the floodgates. Phase 3 lane shifts will begin January 2011 until March 2011. last updated July 22 |
| |
| Roadwork - LA 63 |
LA 63 in both directions: from LA 444 to LA 42 construction work, road closed intermittently from 08:00am CDT to 04:30pm CDT on weekdays — starting 8:00 AM, 09/07/10 until September 16 Comment: LA 63 between LA 42 and LA 44 will be closed intermittently in both directions. last updated August 30 |
| |
| Roadwork - LA 66 |
LA 66 eastbound: between LA 969; Magnolia Court and Webbs Trailer Park Road construction work, lane closed — until September 30 Comment: LA 66 Eastbound will be closed approximately 14 miles from US Hwy 61. There will be a flagman in place to direct traffic. Permit Load Restriction: 11 ft. wide. last updated August 6 |
| |
| Roadwork - LA 77 |
LA 77 in both directions: at US 190 construction work, roadway reduced to one lane — until February 28, 2011 Comment: LA 77 between the Iberville Parish Line and US 190 will be reduced to one lane with flaggers present. last updated August 6 |
| |
| Roadwork - LA 78 |
LA 78 in both directions: at Tiger Street road closed, construction work — starting 6:00 AM, 09/11/10 until September 12 Comment: LA 78, just south of Tiger St. in Livonia, will be closed. Alternate Traffic Route: La 78 to La 979 to LA 978 to US 190 back to LA 78. last updated August 30 |
| |
| Roadwork - LA 541 |
LA 541 in both directions: from LA 18 to Bridge City Avenue construction work, road closed intermittently, lane closed from 06:30am UTC -04:00 to 05:00pm UTC -04:00 daily — until September 17 Comment: River Road, LA 541 between Bridge City Ave to LA 18 will have alternating lane closures with flagmen present. Alternate Traffic Route: LA 18 last updated August 6 |
| |
| Roadwork - LA 966 |
LA 966 in both directions: between Dreher Road and Folkes Road bridge construction, road closed — until September 26 Comment: Main St. Crossing over Bayou Des Glaises in Moreauville will be closed to replace bridge. Alternate Traffic Route: bridge at Desselle's Crossing, west of town last updated August 19 |
| |
| Roadwork - LA 1032 |
LA 1032 in both directions: at Babins Trail construction work, road closed — until November 22 Comment: LA 1032 will be completely closed at I-12. Alternate Traffic Routes will be posted along the roadway. last updated August 19 |
| |
| Roadwork - LA 3152 |
LA 3152: at LA 48 work on underground services, right lane closed — until today at about 11:45 PM CDT last updated August 27 |
| |
| Roadwork - LA 3152 |
LA 3152 in both directions: at LA 48 road construction, right lane closed — starting 12:00 AM, 09/06/10 until September 10 last updated August 31 |
| |
| Roadwork - LA 3152 |
LA 3152: from Citrus Boulevard to US 61 construction work, left lane closed from 09:00am CDT to 03:00pm CDT on Tuesday, Wednesday, Thursday and Friday — starting 9:00 AM, 09/07/10 until September 10 Comment: Clearview Parkway Southbound from Airline Drive to Citrus Blvd. will have the left lane closed. last updated August 31 |
| |
| Roadwork - LA 3246 |
LA 3246 westbound: between LA 427; Meadow Park Avenue and I-10 roadway reduced to one lane, bridge maintenance operations Width limit 11 ' 0 " — starting 9:00 PM, 09/07/10 until September 10 Comment: Siegen Lane Southbound will be reduced to one lane underneath the I-10 overpass. These closures will allow vehicles 11 feet wide or smaller to pass through the construction zones. Oversize vehicles must detour using US 61 Sorrento exit to I-12 Westbound to I-10. last updated September 3 |